Operational Programme on Transport and Transport Infrastructure 2014-2020

Sofia Metro Extension Project, Stage I, metro diameter II: section Nadezhda Road Junction (MS 5-II) — Cherni Vrah Blvd. (MS 11-II)

The project was approved by the Managing Authority of Operational Programme Transport 2007-2013 on 09.07.2009 and by the European Commission on 22.09.2009.

Deadline:The project is planned to be concluded on 31.12.2014.

Beneficiary: Metropoliten JSC

Budget: Total value of the project: BGN 741,485,759.78

Grant awarded under OP Transport: BGN 362,207,591.81 including VAT

Sources of granted funds:

- European Regional Development Fund: BGN 307,876,453.04

- National co-funding: BGN 54,331,138.77

- Co-funding by Metropoliten JSC: BGN 379,278,167.97

The project is funded under Priority Axis 3 “Improving the intermodality of passenger and freight transportation” and Operational Programme Transport 2007-2013.

Aim of the project

This project aims to connect the Central Railway Station and the International Bus Station with the central city area and, through the metro, with the large residential districts in the western and eastern areas in the direction of the airport, whereby the number of passengers transported after commissioning the metro stations of stage I will total approximately 90,600 passengers per day, and the total number of passengers after concluding this metro extension project will reach about 295,000 passengers per day.

The project efficiency will be ensured in several directions by achieving the following aims:

Location

South-Western region, Sofia city, BG 411

 

 

Technical parameters of project

The Sofia Metro Extension Project, Stage I — metro diameter II: section from Nadezhda Road Junction (MS 5-II) — Cherni Vrah Blvd. (MS 11-II) is 6.5 km long and has 7 metro stations, the average distance between them being 912 m.

The main technical parameters of the project are as follows:

In addition to the construction works the section includes:

Project contractors

Contractor: METROPROEKT Ltd.

Contract value: BGN 2,334,000.00 including VAT;

Contractor: TRAM METRO Holding

1. SK-13 TRANSSTROY JSC

2. TRACE GROUP HOLD PLC

Contract value: BGN 8,930,256.70 including VAT

Contractor: KONTROL – 99 Ltd. 

Contract value: BGN 546,110.56 including VAT

Contractor: Consortium METROSTROITELSTVO – 2009

1. STANILOV Ltd.

2. DIMOV COMPANY Ltd.

Contract value: BGN 41,518,833.71 including VAT

Contractor: METRO BUILD Holding

1. SIENIT Ltd.

2. G. P. GROUP Ltd.

Contract value: BGN 64,103,787.91 including VAT

Contractor: METRO BUILD 2010 Holding

1. SIENIT Ltd.

2. GP GROUP Ltd.

Contract value: BGN 25,754,770.78 including VAT

Contractor: Consortium BKS Centre – Balkanstroy:

1. Balkanstroy JSC – Razlog

2. BKS-Centre JSC

Contract value: BGN 21,356,904.02 including VAT

Contractor: METRO BUILD DZZD (DZZD: company under the Law on Obligations and Contracts):

1. SIENIT Ltd. – Plovdiv

2. G. P. GROUP Ltd.

Contract value: BGN 4,798,786.62 including VAT

Contractor: Consortium METROSTROITELSTVO – 2009

1. STANILOV Ltd.

2. DIMOV COMPANY Ltd.

Contract value: BGN 3,458,453.89 including VAT

Contractor: ITA ENGINEERING Ltd.

Contract value: BGN 21,768,640.99 including VAT

Contractor: OBELYA U-BAN Holding:

1. SK-13 TRANSSTROY JSC

2. SK-13 HOLDING JSC

Contract value: BGN 19,776,432.79 including VAT

Contractor: Energoremont - Montaji Holding

Contract value: BGN 32,855,867.06 including VAT