Project "Highway "Hemus", section "Sofia Ring Road (SRR) – Yana road junction"

A+AA-

The project has been approved by the Managing Authority of the Operational programme "Transport" 2007-2013 on 30.09.2011

Deadline: The Project is scheduled for completion on 31.03.2014

Beneficiary: Agency "Road Infrastructure"

Budget:

Total cost of the project: 56 168 521.07 BGN

Awarded grant under OP "Transport": 47 856 420.81 BGN

Sources of grant funding:

Cohesion Fund of EU: 38 285 136.65 BGN

National co-financing: 9 571 284.16 BGN

The project is funded under Priority Axis 2 "Development of road infrastructure along the Trans-European and major national transport axes" of the Operational Programme "Transport" 2007-2013

Aim of the project

Infrastructure project "Highway "Hemus", section "SRR – Yana road junction" is a part of the Trans-European Transport Corridor IV. The construction of the new section of 8.46 km length will connect the existing section of the highway "Hemus" with the Sofia Ring Road. The realization of the project will significantly contribute towards reducing traffic and increasing traffic flow capacity on Road E-79. An important goal of the project is to improve the environmental situation in the area and improving the safety of travel.

Location

Place of project implementation - South-Western region, district: Sofia

 

Technical parameters of the project

Total length: 8.46 km

Gauge clearance A29 – carriageway with a total width of 11.50 m,  2 x 2 active lanes (9.00 m), 2 x 2 emergency lanes with a width of 2.50m, a dividing strip of 3.50m and two side walks of 1.25m – 29 m in sum

Design speed: 120 km/h

Road junction with Road I–6 at km 1 + 454.37

Yana road junction: at km 8 + 460

Overpasses:3 pcs

Project executors

Executor: CLEA "Hemus A2"

• Leading partner - "Trace Group Hold” SC

• Partner - "Design engineering" SC, Croatia and "CC – 13 Roadstroy" SC, Pernik

The cost of the contract for construction: 38 340 371.34 BGN with VAT

The date of issuance of a building permit: 17.09.2011

Implementation period: 22 months

Construction supervision: "Transconsult – BG" LTD.

The value of the contract: 181 440.00 BGN with VAT

Supervision by the author (direct route) – "Roadproject", LLC

The value of the contract -111 600.00 BGN with VAT

 

 

YouTube icon Instagram icon google plus icon

News

EC allocates 293 million Euro for Plovdiv-Bourgas railway line modernization +

16 November 2018

The European Commission allocated 293 million Euros for the modernization of the railway line between the cities of Plovdiv and Bourgas. The rehabilitation of the 293-kilometer section, which was initiated in the past programing period under Op...

Ivaylo Moskovski: By 2019 Sofia to have 48 km of subway lines with 43 stations +

14 March 2018

The subway is a very good example of an intermodal project and its implementation has been very successful, said the minister of Transport, information Technology and Communications Ivaylo Moskovski during today’s inspection of the works at...

European Commission allocates 451 million Euros for the modernization of Elin Pelin - Kostenetz railway line +

1 February 2018

The European Commission approved the financing of the project for modernization of the railway line Elin Pelin - Kostenetz that amounts to 451 million Euros. Over 51 km of railways and 5 railway stations along the line will be modernized through the...
rss